Back to website
East elevation of the renewed Israel Museum at dusk
East elevation at dusk. Photo: EKA Architects

The Israel Museum

Renewal and expansion, Jerusalem, Israel, 2002–2010

The renewal of the Israel Museum transformed a national institution that had grown tenfold since opening in 1965. The original campus, designed by Alfred Mansfeld and Dora Gad as a modular hilltop village, remained visually coherent as it expanded, but its internal circulation, operations, and visitor orientation had become increasingly difficult. Efrat-Kowalsky Architects prepared a new master plan and renovated the existing buildings, while James Carpenter Design Associates led the expansion and new construction, with A. Lerman Architects serving as production architect.

The design consolidates the museum’s cellular structure through a precise series of new connections: an entrance and ticket pavilion with a generous forecourt, a sheltered Route of Passage, and a central Gallery Entrance Pavilion from which the museum’s wings and departments can be reached. Shaded glass enclosures, filtered daylight, planted courtyards, and selective views reconnect the buildings to Isamu Noguchi’s sculpture garden and make Jerusalem’s intense light an organizing element of the visitor experience.

The work also reorganized the galleries for clearer access, orientation, and visibility; renewed building systems; rehabilitated the exterior stone and exposed-concrete interiors; and restored natural light to exhibition spaces. By adding less than ten percent to the existing building envelope, the project doubled the museum’s exhibition area while preserving the proportions, material character, and spatial flow of the original campus. The renewed Israel Museum reopened to the public in July 2010, on schedule and on budget.